ISS Daily Summary Report – 7/26/2024

Boeing CST-100 Crewed Flight Test (CFT): The CFT crew continued assisting the ISS crew with various audits and housekeeping.  They also performed CloudNet Testing and STEMonstration Earth Science activities. Payloads: Sleep in Orbit: A crewmember transferred the MicroSD memory card into a Columbus Payload Laptop to allow the ground to downlink data. The Sleep in …...

ISS Daily Summary Report – 7/25/2024

Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew performed checkouts and measurements in preparation for a future potential CFT undock. They also assisted the ISS crew in NanoRacks Airlock (NRAL) restow operations. Payloads: KIBO Robot Programming Challenge 5: Preparation activities and the Robo-Pro Challenge #5 Technical Rehearsal were performed using JEM Camera Robot …...

ISS Daily Summary Report – 7/23/2024

Boeing CST-100 Crewed Flight Test (CFT): The CFT crew assisted the ISS crew by performing payload activities. They completed the ArgUS 1-1 sub-payloads installation and several Thor-Davis sessions. Payloads: ArgUS 1-1: The ArgUS 1-1 sub-payloads were installed onto the ArgUS Multi Payload Platform and stowed in the NanoRacks Airlock (NRAL). More information about this investigation …...

ISS Daily Summary Report – 7/22/2024

Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew by performing stowage clearing operations to prepare for the ArgUS installation operations. They also uploaded new software into the Microgravity Science Glovebox (MSG) Laptop Computer (MLC). Payloads: JEM Internal Ball Camera 2: The JEM Internal Ball Camera Robot 2 was setup …...

ISS Daily Summary Report – 7/18/2024

Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew with a few payload activities and completed Onboard Training for Backup Flight Control Proficiency. Payloads: Electro-static Levitation Furnace (ELF): The ELF cartridge holder containing the latest melted sample was removed and replaced with a new sample holder and sample. The completed …...

ISS Daily Summary Report – 7/17/2024

Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew by completing the ongoing Plant Water Management 6 (PWM-6) activities. Payloads: Plant Ultraviolet-B (Plant UV-B): A laptop was connected and setup in preparation for future Plant UV-B operations. More information on this experiment can be found here. Plant Water Management 6 …...

ISS Daily Summary Report – 7/16/2024

Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew by completing a Waste Hygiene Compartment (WHC) Filter Removal & Replacement (R&R), and completing various hydroponic flow tests with Plant Water Management 6 (PWM-6) hardware. Payloads: Lumina: The crew power-cycled the Lumina hardware, and transferred the science data to a Station …...

ISS Daily Summary Report – 7/15/2024

Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew by performing a USOS food audit and continuing to complete different payload activities. Payloads: Combustion Integrated Rack (CIR): Fuel Oxidizer Management Assembly (FOMA) Calibration was performed. The upper rack doors were opened, the bottle valves were closed, the pressure in the …...

ISS Daily Summary Report – 7/12/2024

Northrup Grumman 20 (NG-20) Cygnus Departure: Today, Cygnus unberthed from the Node 1 Nadir Common Berthing Mechanism (CBM) using the Space Station Remote Manipulator System (SSRMS), then maneuvered to the release position and released for departure at 6:03 AM CST. Cygnus, filled with waste/trash from the space station packed by the crew, will perform a …...